top of page

THE WALL OF INJUSTICE 

"Small" cell poles unnecessarily dominate Tucson's homes and streets  
Capture_Small cell poles April 13'2021.J

Blenman-Elm

North Dodge

      Their antennas are OVERPOWERED  
Federal law requires use of the minimum power necessary to carry out
the communication desired (47 U.S. Code §324).  "Communication desired" means telecommunications service, as defined in 47 U.S. Code §153.        
 
                 Telecommunications  ≠  internet services
It requires
5 bars on 
a cell phone
                        
2
           5 bars needs
            0.002 µW/m  
       Maximum Power Output
             This home is getting 11,500 µW/m 
                 5.8 million times more than needed!
2
IMG_5500.JPG
The poles dramatically
alter the landscape,
without consent

San Carlos

Near our schools

Sam Hughes Elementary

Verizon withdrew its application for

this site, but a tower is planned for installation near first base on the playground baseball diamond.

Peter Howell Elementary

 Pole #3

​

Pole #2

 Pole #1

Mansfield Middle School

Meter reading at first

floor window

Tucson High Magnet School 

They are everywhere
IMG_1357.JPG

Peter Howell

IMG_1393.JPG

Oak Flower

Keeling

Near our businesses 

 Mendez Bakery, Santa Rita Park

 Eeegees, Speedway and Tucson 

 Bob Dobbs retail complex 

Near our parks 

Himmel Park

Keeling

South West Tucson 

IMG_5485_edited_edited_streetname removed.jpg

Peter Howell neighborhood 

IMG_1380.JPG

This tower measures in at

60,000 µW/m 

30 million times more than

needed for telecommunication

2
bottom of page